Pinners Hall - Infrastructure Redesign

Location: City of London | LONDON

Timeline: November 2005 - September 2014

Project Value: £5M

Role of FCM: FCM were employed as Lead Consultant in this project.

Project Description: This project involved the reconfiguration of the plant areas in the roof and basement of the property in order to install a new 2.5MW HV generator in an acoustic enclosure on the roof, install a new mansard to meet the planning requirements, and move all plants to allow the installation. The HV network also had to be revamped, including the moving of existing HV switchgear, installing new switchgear and introducing the vital interlocks, to allow the system to work in accordance with the requirements of the site and the constraints of the Edf Network.